Two Bathrooms Rebuilt to a New Floor Plan in Newton: What the Work Actually Involved

Two bathrooms in Newton rebuilt around a new floor plan: walls came down, new framing and door openings went up, and new plumbing, electrical, insulation, and two fully waterproofed walk-in showers followed — then tile, drywall, vanities, mirrors, and paint. Here is what the real scope of work looked like, step by step.

Two Bathrooms Rebuilt to a New Floor Plan in Newton: What the Work Actually Involved Read More »

Bathroom Pocket Door and Decorative Glass Window in Walpole: What’s Really Involved

A Walpole bathroom rebuild: walk-in shower on a mortar base with full waterproofing, a pocket door, a window reframed with decorative glass, a linen closet relocated from the hallway into the bathroom, plus new tile, vanity, shower valve, toilet, exhaust fan, and lighting. Here is what the real scope of work looked like.

Bathroom Pocket Door and Decorative Glass Window in Walpole: What’s Really Involved Read More »

Replacing a Bathtub in Lexington, MA: What We Did While the Tub Was Out

A Lexington homeowner replaced the bathtub — and used the opportunity to take care of the work around it: a new shower valve and drain, full waterproofing with cement board above the tub, new wall and floor tile, a shortened baseboard heater, a scraped popcorn ceiling, and new vanity, mirror, toilet, fan, and finishes. Here is what was done and why each piece happened while the tub was out.

Replacing a Bathtub in Lexington, MA: What We Did While the Tub Was Out Read More »